Technical Expertise in Render Failure
As part of our technical services, we proudly offer a consultancy service to the National House Building Council (NHBC). We can draw on our vast knowledge of the rendering, plastering and construction industry, with experience in render and plaster application, bricklaying, house building, building control and site inspection.It is this experience and knowledge that the NHBC claims department have called upon time and time again when they require they require assistance with render claims.
A schedule of works was agreed between SAS and the NHBC to replace the failed system with ProWall our rendered rainscreen cladding system. This project emphasises the importance of considering all aspects of movement, shrinkage and detailing at the design stage and during application when choosing a rendered rainscreen cladding system. ProWall achieves this with a complete system backed with expert technical advice and site visits from initial design to project completion.A case study regarding the claim can be downloaded here..
Comments for this post are closed.